1.Plastic Coupler (Push-fit type / Compression type): It is used to couple two ducts. easy to install and shall provide air tight and water tight joint between the two ducts.
.
2 End Plug: This is for sealing the ends of the empty ducts, prior to installation of the OF cable.
3 Cable Sealing Plug: Is used to seal the ends of the ducts perfectly to prevent the entry of dirt, water, moisture, insects/rodents etc.
4 End Cap: is made of hard rubber, shall be fitted into both ends of duct during the transit and storage.
Tools:
1. Rotatry Duct Cutter: Cut the duct ends squarely without any burr or notch.
2 Spanner: Tighten Plastic Coupler properly so as to ensure air/ water tightness
3 Chamferring Tool: Chamfer to the ends of PLB Ducts